Installation

Getting Started

The sheet metal sides and top are easily

removed to reduce the chance of dents and/or

scratches in the finish. Simply lift the top off, and

that will allow the sides to be pulled away and up,

for removal. To re-install, slide the channel, at the

bottom of each side piece, over the lip at the bot-

tom of the boiler, and hold downward while mov-

ing the side panel into place. Then slide the top

down over the sides.

NOTE: The sheet metal top holds the sides in

place, thus, no bolts or screws are needed.

Caution: Boiler should not Be

installed Closer than 36 inChes

(915 mm) to any ComBustiBle ma-

terial

Locating Boiler

Place the boiler as close to the chimney as

possible, while still maintaining the above men-

tioned clearances. Bolt the shaker handle on to

the block on the side of the boiler, using the (2)

5/16 X 3/4 in. bolts and lock-washers.

Assembly

Install the Temperature/Pressure Gauge

into the pipe stub in the center of the round plate

on the front of the boiler (FIG. 1)

Install the A350 sensor wire all the way into

the immersion well and screw the well into one of

the top holes on the face of the boiler.

Turn the pressure relief valve into the stub

on top of the boiler, next to the supply outlet fit-

ting.

NOTE: Use teflon tape to seal the threads

on all fittings. Any unused fittings must be

plugged.

Bolt the two manual draft controls

through the holes in the top load door. (FIG.2)

The draft control knob should spin freely and

open to a distance of approximately 3/8 in. from

the door surface, while being able to close against

the door surface.

FIG.

/8 to 1/ in.

Immersion Well

Temp/Pressure Gauge

Optional Electric

Back-up Elements

Automatic Draft Control

Pressure Relief Valve

FIG.1

Johnson Controls

Aquastat and

Terminal Block

Shaker Handle

Domestic Hot Water

Coil Option

Advertising