Step 9, install shelf only, Step 10, install implement rods, Installation instructions – GE ZV48R User Manual

Page 15: Step 10 install implement rods, Finalize installation, Step 9 install shelf “only

Advertising
background image

15

Installation Instructions

STEP 10 INSTALL IMPLEMENT

RODS

• Use a flat blade screwdriver to install stand-offs into

the bottom of the hood.

• Align implement rod to stand-offs with the screw hole

towards the inside of the hood. Secure the rod to the
stand-offs with the supplied Allen wrench.

• Follow the same procedure on the opposite side.

FINALIZE INSTALLATION

• Install the supplied infrared bulb(s).
• See the Owner’s Manual for instructions to test

operation.

Screw

Stand-offs

Into

Hood

Use Allen

Wrench to

Secure Rod

to Stand-offs

STEP 9 INSTALL SHELF “ONLY”

• Remove shelf packaging and protective film.
• If installing the shelf alone, without the backguard,

place shelf against the bottom of the hood and mark
screw hole locations “B” on the wall.

• Drill two 1/8" pilot holes.
• If drill did not enter studs, enlarge holes to 3/8".
• Insert wall anchors into enlarged holes. Remove

screws from wall anchors.

• Install two shoulder screws into holes “D” in the

bottom of hood flange leaving 1/8" gap.

• Engage shoulder screws into the keyhole slots in the

top of the shelf. Slide shelf towards the left to lock
into place.

• Install two 3/4" long machine screws through the

bottom of the shelf into the bottom hood flange,
location “E”.

1/8"

Gap

D

E

Mounting

Holes

for Shelf (B)

D

E

B

B

Advertising