Parts provided, Installation preparation, Hardware package – GE ZV48R User Manual

Page 9

Advertising
background image

9

PARTS PROVIDED

Locate the parts packed with the hood.

2 Stainless Steel Grease Filters

(3 filters with 48" models)

Allen Wrench

For Implement Rods

Installation Preparation

Duct Transition

with Damper

Backguard

2 Implement Rods and 4 Stand-offs

Heat Lamp

(2 with 48" models)

10 Phillips head screws.

Use 6 to secure hood to the

wood support. (2 are

secured to wood support)

Use 2 to secure 30" and 36"

backguards to wall. Use 4 to

secure a 48" backguard.

4 Phillips head screws to

secure the duct transition to

the hood outlet on the top.

6 (3/16") hollow wall anchors

with screws use 2 to secure

hood to the wall at the bottom.

Use 4 to secure backguard

and shelf.

4 screws to secure the wood

support to the wall

POZIDRIV 3

1 hex head safety screw

and lock washer, to

secure the blower.

2 flat washers

for wall anchors

Wood Support

with Original Screws

Warming Shelf

2 shoulder screws

to secure shelf to

bottom of hood.

2 Phillips head machine

screws to secure shelf to

bottom of hood.

Grease Tray

Locate and check contents.
Screws shown actual size.
Note:

Hardware appearance

may vary slightly.

HARDWARE
PACKAGE

Advertising