Remove the packaging and parts, Installation below a countertop, Installation preparation – GE ZTD910 User Manual

Page 5: Remove packaging and parts

Advertising
background image

5

Installation Preparation

Warming Drawer

• Place carton on a flat surface.
• Open one end of the carton and lift off

the top piece.

• Lift the warmer up and out of the carton.
• Place the drawer on top of the shipping

carton to protect the drawer front and
the finished flooring.

Remove
Packaging
and Parts

• When installed, the front face of the drawer

will be nearly flush with adjacent cabinetry
doors.

• Drawer overlaps will conceal cut edges on

all sides of the opening.

The rough opening for the drawer must be:

– Depth: 23-1/2" min. from inside back to

front of cabinet frame.

– Width: 25-1/2" for 27" wide models,

28-1/2" for 30" wide models.

– Height: 9-1/4".

• 5" min. above floor or 1" above toekick.

23-1/4" from floor to bottom of cutout is
recommended for under countertop
installation.

Installation below a cooktop:
Warming drawers are approved for installa-
tion below only certain specified cooktop
models. See the label attached to the top of
the warming drawer for approved models. A
solid barrier and air gap between cooktop and
warming drawer is required. See Note above.

Installation
Below a
Countertop

Dim. A

ZTD910 28-1/2”

ZKD910 25-1/2”

Installation below a cabinet drawer:
The warming drawer may be installed beneath
a cabinet drawer. In this installation, a solid
barrier should be installed above the warming
drawer to block access. Use any solid material
such as 1/4" thick plywood. Allow at least 1/4"
air gap between the barrier and the top of the
warming drawer. Observe the 5" min. above the
floor or 1" above the toekick minimum
installation height.
NOTE:

If you are installing in frameless cabinets,

it may be necessary to install 1/2" wide cleats to
accept drawer mounting screws. See drawer to
find exact locations of mounting screws.
Side to Side Installation:
Install two warming drawers in separate cutouts.
Allow 2" min. between cutouts.

• Remove all packing materials and tape.
• Locate package containing 4 wood screws

and set aside.

Parts provided:
• 4 Wood Screws

*NOTE: When installing the warming drawer below a
cooktop, a solid barrier must be installed at least 1" from the
lowest point of the bottom of cooktop burner box to the top of
cutout. Use any solid material such as 1/4" thick plywood.
Allow at least 1/4" air gap between the barrier and the top of
the warming drawer. See label on top of the warming drawer
for approved cooktop models.

2"

Min.

Side to Side Installation

Electrical
Outlet 16" Max.
From Left Side.

Installation Below

a Drawer

23-1/2" Min.

Solid Barrier

1/4"

Air Gap

25"

1-1/2" Cabinet Top

36"

Countertop

Height

1" Min.*

A

9-1/4"

Electrical Outlet 42" Max.

From Right Side.

Install a Solid Barrier

Below a Cooktop

See Note

Electrical Outlet
Flush With Side
of Cabinet 7" Max.

9"

Install
2x4 or 2x2
Anti-Tip Block
Against Rear
Cabinet Wall
9" From Floor
to Bottom
of Block

7"

Install a Solid Barrier

and a 1/4" Air Gap

Above Warming Drawer

Advertising