Installation overview, Required information, Installation overview required information – GE ProBridge PBe User Manual

Page 13

Advertising
background image

9

Installation overview

The basic steps required to install the PBe are:

1. Physically connect the PBe interface to the network

switch or hub and the DVR using the supplied cables.

2. Program monitor mode to on by setting SW1 switches 1

to 4. See

SW1 switches 1 to 4

on page 20 for the switch

settings.

3. Program the camera number to be associated with the

ATM’s transaction data to the PBe. See

SW1 switches 5

to 8

on page 21.

4. Program the DVR to record in the way desired for your

specific site.

Required information

The following information is required for a successful PBe
installation. This information is used to configure the PBe. You
will need to contact the customer’s ATM network administrator
for answers to these questions.

Ethernet device type

Generic interface

Native ATM messages (FC)

Verifone POS

Ethernet data analyzer

Advertising