Operation, 1 start-up – MGE UPS Systems 3000 User Manual

Page 16

Advertising
background image

Page 16 -

3400723100/AD

1

2

%

%

3. Operation

3.1 Start-up

15

16

17

Press the ON / OFF button 15 .
The buzzer beeps and all the LEDs come ON.
The buzzer beeps twice during the self-test, then button 15 remains
ON, indicating that the receptacles are supplied with power.
- AC power is present: Only button 15 is ON. The protected equip-
ment is supplied by the AC-power source.
- AC power is absent: Button 15 and LED 16 are ON. The protected
equipment is supplied by the UPS, operating on battery power.

All the connected equipment is supplied with power.

1

2

%

%

Advertising
This manual is related to the following products: