III. MAINTENANCE - EVERY 3 MONTHS

A. Check that the oven is cool and the power is disconnected,

as described in the warning at the beginning of this Section.

B. Vacuum both of the blower motors, and their surrounding

compartments, using a shop vacuum.

C. Tighten all electrical control terminal screws.

D. Split Belt Disassembly and Cleaning

For split belt ovens ONLY, disassemble, clean and lubri-

cate the conveyor shaft components as described below.

1. Remove the motor shroud, conveyor extensions, and

conveyor as described in Part II, Monthly Maintenance.

2. Remove the master links from each conveyor belt.

Then, roll the belts up along the length of the conveyor

to remove them from the frame.

3. Remove the two conveyor adjustment screws from the

idler end of the conveyor frame, as shown in Figure 4-

5.

4. Remove the idler shaft assembly from the conveyor.
5. Pull apart the two sections of the idler shaft. Clean the

shafts thoroughly using a rag. Then, lubricate both the

extended shaft and the interior of the hollow shaft using

a light food-grade lubricant.
CAUTION

DO NOT lubricate the shafts using WD40 or a similar

product. This can cause the shafts to wear rapidly.

6. Before reassembling the shafts into the conveyor

frame, check that they are oriented properly. Remem-

ber that unequal-width split belt ovens should AL-

WAYS have the narrower belt at the front of the oven.

7. Reassemble the idler shaft into the conveyor. Make

sure that the bronze washer is in place between the two

sections of the shaft. See Figure 4-7.

8. Replace the conveyor adjustment screws as shown in

Figure 4-5. To allow the conveyor belt to be reinstalled

later, do not tighten the screws at this time.

9. Loosen the set screw on both of the conveyor drive

sprockets. Then, remove the sprockets from the shaft.

10. Loosen the locking collar set screw, as shown in

Figure 4-6.

11. Push the drive shaft to the right, then lift it free of the

conveyor frame. Then, disassemble and lubricate the

two sections of the drive shaft as described in Step 5.

12. Before reassembling the shafts into the conveyor

frame, check that they are oriented properly. Remem-

ber that unequal-width split belt ovens should AL-

WAYS have the narrower belt at the front of the oven.

13. Reassemble the drive shaft into the conveyor. Check

that the nylon spacer is in place, as shown in Figure 4-

7. Also, check that the bronze washer is in place

between the two sections of the shaft.

14. Replace the drive sprockets. Reassemble the belts

and master links onto the conveyor, and replace the

conveyor in the oven.

15. Reassemble the motor shroud and conveyor exten-

sions onto the oven.

Figure 4-5 - Split Belt Idler Shaft

Figure 4-6 - Split Belt Drive Shaft

Figure 4-7 - Washer and Spacer

Conveyor

adjustment

screw

Locking collar

Bronze washer on

BOTH idler and

drive shafts

Nylon spacer

on drive shaft

ONLY

SECTION 4 - MAINTENANCE

16 Check the tension of the conveyor belt as shown in

Figure 2-10 (in Section 2, Installation). The belt should

lift between 75-100mm. If necessary, adjust the belt

tension by turning the conveyor adjustment screws.