Installation, 4 connecting the protected equipment – MGE UPS Systems 2200 User Manual

Page 13

Advertising
background image

34007115EN/AA

- Page 13

Ue/In/Eing 230V/10A Max

1

2

Us/Out/Ausg I max 10A

2.4 Connecting the protected equipment

Check that the indications on the rating plate on the back of the UPS correspond to your AC-power system and to
the actual electrical consumption of all the equipment to be connected to the UPS.

1 - Remove the power cord supplying the
equipment to be protected.
2 - Pulsar Evolution 2200: Connect the
power cord

(1)

just removed from the

equipment to the AC-power socket 11 and
then to the AC-power wall outlet.
- Pulsar Evolution 3000/3000 XL: Connect
the supplied power cord 24 (250 V, 16 A) to
the AC-power socket 11 and then to the
AC-power wall outlet.

3 - Connect the protected equipment to the
UPS using the two cords 25 . It is advised
to connect priority loads to the four standard
outlets 8 and any non-priority loads to the
four programmable outlets 9 (in groups of
two outlets).

If the UPS is connected to a
computer running MGE
communications software, it is
possible to program the
interruption of power to the
programmable outlets 9 during
operation on battery power, thus
reserving backup power for the
priority loads.

4 - Lock the connections using the securing
system 29 .

25

8

9

1

2

2. Installation

11

29

As soon as the UPS is energised, the battery begins charging. Eight hours are required to charge to the full rated
backup time.

Pulsar Evolution 3000 XL: At least one EXB additional battery module must be connected to the UPS because it does not
have internal batteries. See the EXB battery-module installation manual (Doc. no. 3400711600) for information on making
the connections.

(1) Make sure the cord has the following
characteristics: 250 V, 10 A, cross-sectional area 1
mm

2

, type HO5.