Section 6 − setting sequence parameters, 1. sequence parameters in a program – Miller Electric DS-64M Swingarc User Manual

Page 23

Advertising
background image

OM-1588 Page 19

SECTION 6 − SETTING SEQUENCE PARAMETERS

6-1. Sequence Parameters In A Program

.

See Menu Guide for detailed
programming steps.

Trim is arc length. If set to zero, arc

length is short. If set to 99, arc

length is long.
If time is set to zero in Weld

sequence, welding continues until

gun trigger is released.
If time is set to zero in any timed

sequence except Weld, the

sequence is skipped.

Trigger

Pressed

Trigger

Released

Wire Speed

Time

Start

Time

Preflow

Run-In WFS

W

eld WFS

Weld Time

Crater WFS

Crater

Time

Postflow

Arc

Strike

Burnback

Time

Time

Time

Postflow

Crater

Weld

Run-In

Preflow

Burnback

Sequence

End

Trim

0-99

Volts

10.0-38.0

Inductance

0-99%

IPM

50-780

Seconds

1. Weld

2. Crater

3. Burnback

4. & 5. Postflow/

Preflow

6. Run-In

Pulse

MIG
Pulse

MIG

MIG

0-100.0

0-5.00

0-0.25

0-9.9

X

X

X

X

X

X

X

X

25-780

X

X

X = Setting available.

Pulse

6. Start

Pulse

MIG

0.00-5.00

X

X

X

X

0-100 sec.

Advertising