Middleby Cooking Systems Group PS360/PS360WB User Manual

Page 30

Advertising
background image

2-16

SECTION 2

INSTALLATION

5. Check the alignment of

the track rails using a

straightedge. The rails

MUST BE LEVEL across

the gap between the

ovens. If necessary,

adjust the oven legs to

align the track rails.

Figure 2-19

Checking Track Rail Alignment

6. Tighten all of the attaching bolts. Check that the mating

edges of the ovens align properly. If gaps appear between

the tops of the ovens, it will be necessary to loosen the

connecting bolts and realign the ovens.

IMPORTANT: If it is necessary to realign the ovens,

remember to re-check the alignment of the track rails.

7. Attach the front trim strip

between the two ovens, as

shown in Figure 2-20.

Figure 2-20

Trim Strip Positioning

Trim strip

8. Perform one of the following, as appropriate:

• For PS360/360WB Tandem and Double Tandem

installations, skip ahead to the INSTALLING THE

CONVEYOR FRAME AND BELT section (Page 2-19).

• For PS360/360WB Tri Tandem installations, perform

Steps 1-7 again to attach the third oven to the two that

have just been assembled. Then, skip ahead to the

INSTALLING THE CONVEYOR FRAME AND BELT

section (Page 2-19).

• For PS360/360WB Quad Tandem installations, perform

Steps 1-7 again to attach the two remaining ovens to

each other. Then, continue on to Step 9 to attach the

center (transition) section.

Advertising