Installation (cont.) – Moyer Diebel 301HT User Manual

Page 12

Advertising
background image

4

INSTALLATION (CONT.)

COMPLETING THE INSTALLATION

1. Recheck for and remove any foreign materials from inside the machine.

2. Center the scrap screens over the sump opening

3. After Plumbing and electrical connections are completed, check machine for water leaks by

closing the door, then depressing the ON switch. This allows the tank to begin filling and to
reach temperature.

4. Open the door and check the water level. The water level should be a two inches above the

scrap screen.

5. Close the door (the machine has a door safety switch and will not start until the door is

closed.

INSTALLATION

Advertising