Caution – Meco Assie Vantage LP 67c3c8kk81 User Manual

Page 9

Advertising
background image

9

Step 8

Side Table Assembly

A.

Screw two 1/4-20 x .50” Bolts into the two bottom threaded inserts on the outside of the Bowl. Do not screw Bolts

all the way. Leave 1/8” of each Bolt exposed.

Align the bottom two holes (“keyhole slots” in detail) on the inner side of the LEFT Side Table with the two bolts thread-
ed partly into the inserts in the Side of the Bowl then slide the Side Burner Table over the Bolts.

B.

Holding the Side Burner Table in place, install two 1/4-20 x .50” Bolts from the inside of the Bowl into the two top

threaded holes in the Side Table.

C.

From under the Side Table, install one 5/32 x .31” bolt through the Side Table end into the side of the Bowl.

Repeat this assembly for the RIGHT Side Table. Tighten all bolts.

1/4-20 x .50” Bolt set

8 pc

Prior to performing any further assembly, PERFORM “FIRST TIME USE” LEAK TEST

as detailed on pages 16-17.

If the grill is fully assembled before performing the First Time Use leak test, the side tables will need to be removed in order to perform the

leak test on the main burner valves inside the control panel, behind the knobs, .

CAUTION

!

5/32 x .31” Bolt set

2 pc

5/32 x .31” Bolt

A

Keyhole Slots

B

C

Advertising