Installing a single hub – Intel Express 100BASE-T4 User Manual

Page 13

Advertising
background image

10

C H A P T E R

2

Intel Express 100BASE-T4 Stackable Hub

CAUTION

Don’t connect the power cord
to a hub until all hubs are
installed, connected together
through cascade cables, and
ready for operation.

Installing a Single Hub

To install the hub in a rack

1

Attach the mounting brackets to the sides of the hub.

2

Align the mounting holes in the brackets with the holes in the rack.

3

Insert two pan-head screws with nylon washers through each
mounting bracket and into the rack.

CAUTION

The power cord is a North
American type, UL-listed/
CSA-certified power supply
cord. Discard this cord if it’s
inappropriate for the electrical
system of your country, and
get the cord required by your
national electrical codes or
ordinances and certified for
use in your region.

NOTE

Only qualified technicians
should install and maintain
this equipment.

4

Connect the AC power cord to the hub and then to the wall outlet
or power strip.

To install the hub on a table or shelf

When installing a hub on a table or shelf, place the self-adhesive feet
on the bottom of the hub.

Advertising