Quick start – Intel Express 100BASE-T4 User Manual

Page 5

Advertising
background image

1

Quick Start

1

Install the hub(s).

Maximum stack:

Six hubs

Rack requirements: Standard 19-in (48.26 cm), 1.5 EIA rack-mount

space for each hub

Shelf requirements:

Support for 10 lbs (4.5 kg) per hub
12.3 lbs (5.6 kg) with uplink module and NMM

2

Connect the stack.

Use the cascade cables to connect multiple hubs.
You need to purchase cascade cables separately
from your network services supplier (see
Appendix B for more information).
Do not use UTP cabling to connect hubs.

3

Connect the devices.

Connect 100BASE-T4 devices to the hub using four-pair
Category 3, 4, or 5 unshielded twisted pair (UTP) cabling.
Maximum cable distance between a port and an attached
device is 100 meters.

4

Plug power cords into each hub, then check LEDs.

• Make sure the Pwr LED is lit for all hubs.
• Make sure the numbered port LEDs are lit for connected devices.

Pwr LED

Port LEDs

Advertising