English, Drop-in installation – Jacuzzi HD84000 User Manual

Page 13

Advertising
background image

Luxury Whirlpool Bath

Installation and Operation

www.jacuzzi.com

Page 13

English

Before you begin your installation, please read the following:

Drop-in Installation

Observe all local and building codes.

Determine which tools will be used during the installation.

Additional bathtub drain parts and plumbing are commercially available at plumbing and hardware stores.

Drain/Overflow rough-in information is included with your bathtub in the installation instruction manual.

Flashing

Exploded View

1˝ x 4˝

(25mm x 101mm)

Not For Support

Mortar or

Adhesive

Subfloor

Sealant

Tile

Complete the bathtub surround installation (Figure 8).

1

Install drain/overflow according to the

manufacturer’s instructions. Refer also to the

Technical Specifications Manual.

Watertight installation of the drain is the installer’s

responsibility. Drain leakage is excluded from the

Jacuzzi Luxury Bath warranty of this product.

2

Install the faucet at this time. It is recommended

that the faucet be installed by a qualified plumber.

Proper installation of the spout plumbing and

compliance with local codes are the responsibility of

the installer. Jacuzzi Luxury Bath does not warrant

connections of water supply fittings and piping,

fill systems, or drain/overflow systems. Nor is it

responsible for damage to the bathtub which may

occur during installation.

A non-flammable protective barrier must be placed

between the soldering work and the bathtub unit to

prevent damage to the bathtub.

3

Prepare the cut-out hole for the bathtub using

either the provided full scale template or the cutout

dimensions listed in the specifications table in the

Technical Specifications Manual.

The template may show guides for more than one

bathtub, be certain to select the appropriate guide

lines. If under mounting is an option, be careful to

select the guide lines that apply to the installation

that you are performing.

4

Complete all deck finish work and cover to protect

from damaging while placing the bathtub.

5

Insulation may be placed within the bathtub

surround.

Provide adequate ventilation around the motor/

pump to ensure sufficient airflow and cooling.

6

Turn off power supply to dedicated GFCI protected

circuits.

7

Place a piece of scrap lumber on each of the ends

of the cutout – this will be used as a temporary

support prior to lowering the bathtub fully into the

opening (Figure 9).

Tile or Finished

Surface

Substrate

Scrap Lumber

Support

Member

Level Subfloor

Scrap Lumber

Minimum 3˝

(76mm)

Clearance

Figure 8

Figure 9

Advertising