Juniper Networks EX4200 User Manual

Page 108

Advertising
background image

Table 24: Site Preparation Checklist (continued)

Date

Performed By

For More Information

Item or Task

“Rack Requirements for EX3200 and
EX4200 Switches” on page 87

“Cabinet Requirements for EX3200
and EX4200 Switches” on page 89

Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.

“Clearance Requirements for Airflow
and Hardware Maintenance for
EX3200 and EX4200 Switches” on
page 91

Plan rack or cabinet location, including required
space clearances.

Secure the rack or cabinet to the floor and
building structure.

Wall

“Requirements for Mounting an
EX3200 or EX4200 Switch on a
Desktop or Wall” on page 90

Verify that the wall meets the minimum
requirements for the installation of the switch.

“Clearance Requirements for Airflow
and Hardware Maintenance for
EX3200 and EX4200 Switches” on
page 91

Verify that there is appropriate clearance in
your selected location.

Cables

Acquire cables and connectors:

Determine the number of cables needed
based on your planned configuration.

Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.

Plan the cable routing and management.

Related Topics

General Safety Guidelines and Warnings for EX Series Switches on page 207

General Site Guidelines for EX Series Switches on page 83

Installing and Connecting an EX3200 or EX4200 Switch on page 113

Mounting an EX3200 or EX4200 Switch on page 116

82

Site Preparation Checklist for EX3200 and EX4200 Switches

Complete Hardware Guide for EX3200 and EX4200 Ethernet Switches