Figure, Figure 23, Figure 25 – State Industries ULTRA FORCE 101 User Manual

Page 28: Figure 23, figure 24, Vertical termination - direct vent

Advertising
background image

28

2” (5 cm)

MAXIMUM

FACTORY SUPPLIED

STANDARD TERMINATION

POINTED DOWN TOWARDS

THE GROUND

VERTICAL TERMINATION(S) INSTALLATION

INTAKE AIR AND/OR VENT (EXHAUST)

FIELD

SUPPLIED

90° ELBOW

FIELD

SUPPLIED

STRAP/SUPPORT

FIELD SUPPLIED

PLUMBING

ROOF BOOT

OR FLASHING

MAINTAIN 12” (30 cm)

18” (45 cm) FOR CANADA

MINIMUM CLEARANCE

ABOVE HIGHEST ANTICIPATED

SNOW LEVEL.

NOTE: INTAKE AIR

TERMINATION

SHOWN HERE

figure 23

INTAKE AIR AND/OR VENT

TERMINATION(S) MUST BE A

MINIMUM OF 24 INCES (60 cm)

ABOVE ANY PARAPET, VERTICAL

WALL OR STRUCTURE WITHIN

10 FEET (3 m) HORIZONTALLY.

VERTICAL TERMINATION(S) FLAT ROOF CLEARANCE

INTAKE AIR AND/OR VENT (EXHAUST)

24 INCHES (60 cm)

MINIMUM HEIGHT ABOVE

IF LESS THAN

10 FEET (3 m)

NOTE: VENT

TERMINATION

SHOWN HERE

figure 24

VERTICAL TERMINATION - DIRECT VENT

STANDARD TERMINATIONS

24 INCHES (61 cm) MINIMUM

48 INCHES (122 cm) IN COLDER CLIMATES

FACTORY SUPPLIED

STANDARD TERMINATIONS

POINTED DOWNWARD

FIELD

SUPPLIED

90° ELBOW

VENT (EXHAUST)

TERMINATION

INTAKE AIR

TERMINATION

FIELD SUPPLIED

PLUMBING

ROOF BOOTS

OR FLASHINGS

MAINTAIN 12” (30 cm)

18” (45 cm) FOR CANADA

MINIMUM CLEARANCE

ABOVE HIGHEST

ANTICIPATED SNOW LEVEL.

figure 25

Advertising
This manual is related to the following products: