Smith Cast Iron Boilers GB100W User Manual

Page 16

Advertising
background image

Page 16

GB100W NATURAL OR PROPANE BOILER

INSTALLATION AND OPERATING INSTRUCTIONS

Figure 17: Multi Zone Diagram

CIRCULATOR

ZONE 2

LINE VOLTAGE
LOW VOLTAGE

CIRCULATOR

ZONE 1

R882C

ZONE 1

THERMOSTAT

R882C

ZONE 2

THERMOSTAT

CIRCULATOR

ZONE 3

R882C

ZONE 3

THERMOSTAT

1

PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED.

2

Y

G

W

L2

L1

1

POWER

SUPPLY

C

R

W

1

3

BK

R8285D

1

L1

L2

POWER

SUPPLY

2

W

BK

2

1

24

VAC

N.O.

N.C.

COM.

N.O.

N.C.

COM.

W

B

W

B

N.O.
N.C.

COM.

N.O.
N.C.

COM.

W

B

N.O.
N.C.

COM.

N.O.
N.C.

COM.

SIZE ADDITIONAL TRANSFORMER 15VA PER EACH R882C ZONE RELAY THAT IS REQUIRED.

Figure 15: Multi Zone Diagram

Figure 16: Multi Zone Diagram

TH-TR

END SWITCH

TH

TR

TH-TR

END SWITCH

TH

TR

TH-TR

END SWITCH

TH

TR

(HOT)

1

L2

L1

CIRCULATOR

POWER

SUPPLY

2

V8043F

V8043F

V8043F

T87F ZONE 1

T87F ZONE 2

T87F ZONE 3

1

PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED.

2

SIZE ADDITIONAL TRANSFORMER 8VA PER EACH V8043F ZONE VALVE THAT IS REQUIRED.

LINE VOLTAGE
LOW VOLTAGE

L2

L1

1

POWER

SUPPLY

Y

G

W

C

R

W

1

3

BK

R8285D

LINE VOLTAGE
LOW VOLTAGE

CIRCULATOR

ZONE 1

2

1

3

4

5

6

R845A RELAY

ZONE 1

TO ADDITIONAL

R845A RELAYS

FOR OTHER ZONES

LOW

VOLTAGE

THERMOSTAT

PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION
AS REQUIRED.

1

R8285D

Y

G

W

L
2

L
1

1

POWER

SUPPLY

C

R

W

1

3

BK

Advertising