Drivelines, Drivelines -6, Maintenance – Servis-Rhino FR162 User Manual

Page 162: 80º cv driveline, Telescoping driveline

Advertising
background image

MAINTENANCE

FR240-FR162 01/11

Maintenance Section 5-6

©2011 Alamo Group

MAINTENANCE

DRIVELINES

The Drivelines and U-Joints should be inspected each morning before the Cutter is started. MntP-R-0456 and
Mnt-R-0457.

The U-Joint and CV Joint on the Driveline undergo extreme forces when the unit is turning or when the Wings
are being raised. It is important that the U-Joints and CV Joint be greased each day before the unit is started.
The U-Joints are located at each end of the Center and Wing Drivelines. The CV Joint is located at the end of
the Main Driveline. The U-Joint and CV Joint assemblies are accessible by rotating the Driveline Safety Shield
until the hole in the Shield matches up with the Grease Fitting. UseN.L.G.I. #2 Bearing Grease for lubrication.
Inspect the U-Joint for wear by holding the shaft on one side of the U-Joint while trying to rotate the shaft on the
other side of the U-Joint. If there is noticeable movement in the Driveline replace the U-joint before it causes
severe damage to the Driveline.

STANDARD

EXTENDED LUBE

LEVER

LOCATION

INTERVAL

INTERVAL ACTION PUMPS

Cross & Bearings

* 8 Hours

50 Hours

2 - 3

Telescoping Members

8 Hours

50 Hours

8 - 10

CV Ball & Socket (80º CV)

* 8 Hours

50 Hours

4 - 6

CV Center Housing (80º CV)

24 Hours

50 Hours

12 - 15

CE & Non-Rotating Guard Bushings

8 Hours

50 Hours

2

(1000 RPM MAX.)
* Constant Angle applications may require a Lube Interval of 4 hours.

ROTATING GUARD BUSHINGS SHOULD BE LUBRICATED UPON REPLACEMENT

80º CV DRIVELINE

TELESCOPING DRIVELINE

Advertising