SQM5… Reversing Actuators

Technical Instructions

Document No. 155-517P25

July 9, 2007

Siemens Building Technologies, Inc.

Page 21

AGA56.41/42/43
Circuit Board
Installation,
Continued

5. Re-install the actuator motor capacitor.

See Figure 20.

6. Gently guide the terminal section into

the support slots and slide the terminal
board downward until both supports
snap into place. Ensure that the four
brown wires and the flat white
connector cable which connect the two
circuit boards are positioned correctly
in their respective corners allowing the
board to freely slide into place without
pinching either wire. See Figure 21.

7. Connect the bundled blue, black and

brown potentiometer wires to the
terminal block located on the ASZ…
potentiometer circuit board. See
Potentiometer Installation.