Getting started ventura mpc shipping list – Spectra Watermakers VENTURA 150 MPC-5000 User Manual

Page 6

Advertising
background image

6

Unpack the system and inspect it to make sure that it has not been damaged in shipment.

Refer to the shipping list for your system to make sure you have received all of the compo-
nents listed. Do not discard any packaging until you have found and identified all of the
parts. The small installation parts are listed on the kit list.

Warning! We will not be held responsible for shortages and/or freight damage that are
not reported within thirty days of the ship date.

Study the system plumbing and wiring diagrams before beginning your installation. This
will assist you in understanding the function of each component.

Layout the system. Before starting the installation, identify the location where each module
and component will be placed. Insure that there is proper clearance around the components
for removal of filters and system service. Also check to make sure you have adequate tub-
ing and hose before starting so additional parts may be ordered.

Getting Started

Ventura MPC Shipping List

High Pressure Clark Pump and reverse osmosis membrane module.

Feed pump inlet module with automatic fresh water flush system.

Accumulator tank

Seawater strainer

MPC 3000 control with harnesses

MPC 3000 display panel.

Dual filter assembly with pressure sensors

Installation Fittings Kit

Service Hose kit

5/8” Hose (25’) 2 ea

1/4 product tubing (25’)

Filter wrench

Teflon pipe tape

Advertising