SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS

Figure 15 - Relief & Safely Valve Piping

WATER BOILER PIPING

The supply and return connections should be sized
to suit the system, see Figures 13, 14, 16, 17 and Tables
5 & 6. Do not pipe the supply from the bottom port or
the return to the top port, the boiler will not work
properly. Typical water boiler piping arrangements are
shown in Figures 18 & 19. Swing joints should be used.

Install 3" nipples into the two 3" NPT tappings in the
front section and cap them.

NOTE: See CLEANING OF WATER BOILERS on page
18 before proceeding!

Supply Piping
Install a reducing bushing in the 6" NPT tapping in the
front section to obtain the correct supply pipe size,
Figure 13 and Tables 5 & 6.

Table 6 - Water Boiler Piping

Boiler Size

Return Size

Supply Size

# Sections

NPT

NPT

4 & 5

3

3

6 through 9

4

4

10 through 18

5

5

Note: Sizes based on 20

°

F, 11.1

°

C,

T for the system.

Return Piping 4 Through 9 Section Boilers
Install 3" x 4" NPT bushings in the two 4" NPT tappings
at the bottom of the back section. Install the two 3" NPT
x 6" nipples per Figure 16. Assemble the rest of the
return yoke as shown in Figure 16.

Table 7 - Boiler Water Content

Boiler Model

Water Boilers

Steam Boilers

Gallons

Liters

Gallons

Liters

28A-4

123

466

104

394

28A-5

150

568

126

477

28A-6

177

670

148

560

28A-7

204

772

170

644

28A-8

231

875

192

727

28A-9

258

977

214

810

28A-10

285

1079

236

893

28A-11

312

1181

258

977

28A-12

339

1283

280

1060

28A-13

366

1386

302

1143

28A-14

392

1484

324

1227

28A-15

419

1586

346

1310

28A-16

446

1689

368

1393

28A-17

473

1791

399

1511

28A-18

500

1893

412

1560

Return Piping 10 Through 18 Section Boilers
Install the two 4" NPT x 6" nipples per Figure 16.
Assemble the rest of the return yoke as shown in Figure
16.

Control Installation
Locate the temperature & pressure gage, low water
cutoff, high limit and operating controls per Figures 13
& 7. Optional controls must be installed in accordance
with the control manufacturers instructions and Figures
13 & 17.

NOTE: The front jacket panel MUST be installed
before any controls are attached to the front boiler
section!

CAUTION: The controls must be mounted in the
correct location and according to the control
manufacturer’s instructions or the boiler may not
function properly!

Water Column Piping
A variety of water level controls are available for the 28A.
The water column piping needed to properly mount each
control is available from Smith. Figure 17 shows a typical
water column piping arrangement. The 1" NPT x 7 1/2"
nipple is always installed in the lower water column
tapping, Figures 13 & 17 and Table 5.