Smith Cast Iron Boilers Series 28A User Manual

Page 19

Advertising
background image

Page 19

SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS

Minimum Feed Water

Condensate Receiver

Boiler

I=B=R Gross Output

Evaporation Rate

Pumping Rate

Capacity

Model

MBH

kW

GPM

L/hr

GPM

L/hr

Gallons

Liters

28A-S-4

900

264

1.9

7.3

3.9

14.8

37

140

28A-S-5

1166

342

2.5

9.5

5.0

18.9

48

182

28A-S-6

1433

420

3.1

11.7

6.2

23.5

59

223

28A-S-7

1699

498

3.7

13.8

7.3

27.6

69

261

28A-S-8

1965

576

4.2

16.0

8.4

31.8

80

303

28A-S-9

2232

654

4.8

18.1

9.6

36.3

91

345

28A-S-10

2498

732

5.4

20.3

10.7

40.5

102

386

28A-S-11

2764

810

5.9

22.5

11.9

45.1

113

428

28A-S-12

3031

888

6.5

24.7

13.0

49.2

124

469

28A-S-13

3297

966

7.1

26.8

14.2

53.8

135

511

28A-S-14

3563

1044

7.7

29.0

15.3

57.9

145

549

28A-S-15

3830

1122

8.2

31.2

16.5

62.5

156

591

28A-S-16

4096

1200

8.8

33.3

17.6

66.6

167

632

28A-S-17

4362

1278

9.4

35.5

18.7

70.8

178

674

28A-S-18

4629

1356

9.9

37.6

19.9

75.3

189

716

Figure 21 - Typical Single Boiler Steam Piping

Table 9 - Steam Boiler Capacities

Note: These recommendations are considered normal for compact buildings. Where buildings are spread out,
additional receiver capacity may be necessary because of the extended time required for condensate to return to
the receiver.

Advertising