Chapter 3 installing the switch, Selecting a site, Installing the switch -1 – SMC Networks 1000 User Manual

Page 29: Selecting a site -1, Hapter, Nstalling, Witch

Advertising
background image

3-1

C

HAPTER

3

I

NSTALLING

THE

S

WITCH

Selecting a Site

TigerSwitch 1000 units can be mounted in a standard 19-inch
equipment rack or on a flat surface. Be sure to follow the
guidelines below when choosing a location.

◆ The site should:

be at the center of all the devices you want to link and near
a power outlet.

be able to maintain its temperature within 0° to 50° C and
its humidity within 5% to 95%, non-condensing

provide adequate space (approximately two inches) on all
sides for proper air flow

be accessible for installing, cabling and maintaining the
devices

allow the status LEDs to be clearly visible

◆ Make sure twisted-pair cable is always routed away from power

lines, fluorescent lighting fixtures and other sources of electrical
interference, such as radios, transmitters, etc.

◆ Make sure that a separate grounded power outlet that provides

100 to 240 VAC, 50 to 60 Hz, is within 8 feet (2.44 m) of each
device and is powered from an independent circuit breaker. As
with any equipment, using a filter or surge suppressor is
recommended.

Advertising