Spalding 21196804 User Manual

Page 23

Advertising
background image

10/04

P/N 21196804

23

Place rebar with spacers into bottom pole section (3)
as shown.

.

6.

Assemble rebar centering spacers
(50) near top and bottom of rebar
(49) as shown.

5.

49

Heavy-Duty Tape

(Not Included)

50

49

50

50

49

3

Seal hole at the bottom of the bottom pole
with heavy-duty tape (not included) to retain
rebar and concrete inside.

2"

3"

7.

Reinforcement Bar

Advertising