Important – Spalding 21196804 User Manual

Page 24

Advertising
background image

24

P/N 21196804 10/04

Fill pole with concrete to approximately 1” (2.54 cm)
below bottom elevator hole as shown.

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

1

8.

IMPORTANT!:

FAILURE TO FILL YOUR
POLE COMPLETELY WITH
CONCRETE AS
DESCRIBED IN THESE
INSTRUCTIONS WILL
VOID ALL WARRANTIES
WRITTEN AND IMPLIED.

IMPORTANT!:

Make sure that
concrete does not bulge
from the end of pole
assembly. Allow
concrete to completely
cure.

Advertising