SCM installation checklist

The following table describes the possible installation scenarios for the SCM, the appropriate tasks to
complete for the scenarios, and the order to complete the tasks:

SCM is being.....

Configuration

Tasks to complete and order to complete them

Installed in a RadiSys shelf

Standard configuration. 1.

Install the SCM in the shelf on page 5

2.

Connect to the SCM on page 6

3.

Verify switch operation on page 7

4.

Verify shelf management operation on page 10

____

____

____
____

Installed in a non-RadiSys
shelf

Post-installation configuration required:
After installation of the SCM in the
non-RadiSys shelf, you must disable the
SCM’s on-board Shelf Manager.

1.

Install the SCM in the shelf on page 5

2.

Disable the Shelf Manager on the SCM on page 10

3.

Verify switch operation on page 7

____

____

____

Removed from a non-RadiSys
shelf and reinstalled in a
RadiSys shelf

Pre-removal configuration required:
Before you remove the SCM from the
non-RadiSys shelf, you must enable the
SCM’s on-board Shelf Manager.

1.

Enable the Shelf Manager on the SCM on page 12

2. Remove the SCM from the non-RadiSys shelf. For

SCM removal instructions, see the ATCA-2210 Switch
and Control Reference
.

3.

Install the SCM in the shelf on page 5

4.

Connect to the SCM on page 6

5.

Verify switch operation on page 7

6.

Verify shelf management operation on page 10

____

____

____

____
____

____