First-time installation and configuration, 1 selecting a power supply method – SMC Networks EliteConnect Wireless Bridge SMC2586W-G User Manual

Page 15

Advertising
background image

2. First-Time Installation and Configuration

2.1 Selecting a Power Supply Method

The SMC2586W-G can be powered by either the supplied power adapter or
the optional SMCPWR-INJ3 EliteConnect™ Power Injector. The SMC2586W-G
automatically selects the suitable power depending on your decision.

To power the SMC2586W-G by the supplied power adapter:

1. Plug the power adapter to an AC socket.
2. Plug the connector of the power adapter to the power jack of the

SMC2586W-G.

NOTE: This product is intended to be power-supplied by a Listed Power
Unit, marked “Class 2” or “LPS” and output rated “12V DC, 1.25 A
minimum” or equivalent statement.

NOTE: Units shipping to Europe will have a EU-type or UK-type plug adapter
added separately. The plug adapter simply needs to be inserted over the US
type plug to conform to EU or UK power specifications.

To power the SMC2586W-G by SMCPWR-INJ3 Power Injector:

1. Connect the power cord cable from power outlet to the SMCPWR-INJ3

power connector.

Fig. 1. Connecting the power cord cable to SMCPWR-INJ3.

2. Check the “POWER” LED: if system is normal, the LED will be on (Green

light); otherwise, the “POWER” LED will be off.

3. Connect the Ethernet cable (RJ-45 Category 5) from Ethernet

Hub/Switch to the “DATA IN” port of SMCPWR-INJ3 Power Injector.

4. Connect another Ethernet cable (RJ-45 Category 5) from “POWER &

DATA OUT” port of the SMCPWR-INJ3 Power Injector to the SMC2586W-G
Wireless Bridge.

14

Advertising