Fig. 5-4 – KVH Industries TracVision S2 User Manual

Page 46

Advertising
background image

5-5

Maintenance

54-0196 Rev. A

4. Remove 6 pan head screws from the PCB cover

flanges.

5. Remove the PCB cover. To get the necessary

clearance, rotate the linear actuator up 90º while
lifting the PCB cover – Fig. 5-4.

6. Remove cable connectors from PCB. Figure 5-5

illustrates the PCB arrangement and connector
locations.

7. Remove the 9 pan head screws securing the PCB

to the rotating plate.

8. Reverse this process to install the replacement

PCB. Reinstall all cable connectors removed in
Step 6.

PCB

Limit Switches

RF Connector

to IRD

RF Connector

to LNB

Elevation Motor

Azimuth Motor

Cable Wrap

Fuse

J11

J2

J1

J4

TracVision S2 is equipped with a
5x20 mm, 3.15-amp, 250 volt fast-
blow fuse, which is mounted on the
PCB. To access and replace the
fuse, remove the PCB cover.

Figure 5-5
PCB Connector Locations –
Rear View

PCB Cover

Linear Actuator

Elevation Axis

Motor Shaft

Figure 5-4
Removing the PCB Cover

When replacing the PCB cover, be
careful not to pinch any cables.

Advertising