2 - installation, 2installation – KVH Industries LF User Manual

Page 12

Advertising
background image

2-1

Installation

54-0194 Rev. D

2

Installation

TracVision LF/SF is designed for simple installation and setup.
Just follow these easy steps:

Step

Refer to Section...

1.

Choose the antenna location

2.1

2.

Mount the antenna unit

2.2

3.

Connect the system components

2.3

4.

Activate the IRD

2.4

5.

Check out the system

2.5

Tools and Materials Required

Electric drill

3

16

"-drill bit and

3

4

" hole saw and auger bit

#2 Phillips and #0 flat tip screwdrivers

Silicone sealant or RTV

7

16

"-open end wrench

Adhesive suitable for specific roof construction
and materials (e.g., Liquid Nails)

Rivet gun and

3

16

"-rivets (or other fastener suitable

for specific roof construction)

(Recommended) PC with terminal emulation
software such as Windows Hyperterminal or
PROCOMM and a DB9 (male-to-female) PC data
cable

Kitpack Contents

Table 2-2 lists the materials provided in the kitpack.

Part

Qty.

KVH Part No.

Switchplate Assembly

1

02-1236-01

Tie-wraps

5

22-0013

3

8

" Hole Plugs

2

19-0282-06

RJ11 Handset Cable

1

32-0724-25

Clam Shell Ventilator

1

19-0230

#6 x

3

4

" Thread-forming Screws

5

14-0298-12

IRD Ground Wire (50 ft)

1

32-0583-50

Plan the entire installation before
proceeding! Take into account
component placement, cable
running distances between units,
and accessibility to the equipment
after installation.

While some DIRECTV IRDs
offer on-screen messages, it is
recommended that a PC be
available for all installations of
DIRECTV, EchoStar, and
ExpressVu.

Table 2-2
Kitpack Contents

Table 2-1
Installation Process

Advertising