Install the Support Framework

1. Construct the support framework as shown in the above diagram.

The 2 x 2 should be offset 30 mm from the edges of the 2 x 4’s to support the

pressure balancing assembly at the correct depth.

2. Install the support framework under the pressure balancing loop(s) as

illustrated.

The face of the 2x4’s should be installed flush with the face of the existing

ceiling joists.

Install the Finished Ceiling

1.

Install the water-resistant board.

2.

Cut out a 229 mm to 235 mm square at the desired installation location.

3.

Install the finished ceiling material.

30 mm

Existing
Ceiling
Joist

Existing
Ceiling
Joist

2 x 2

(50 mm x 50 mm)

2 x 4

(50 mm x 100 mm)

2 x 4

50 mm x 100 mm)

368 mm

Typical

Pressure

Balancing

Loop

Existing

Ceiling Joist

2 x 4

(50 mm x 100 mm)

2 x 4

(50 mm x 100 mm)

229mm

2 x 2

(50 mm x 50 mm)

Finished
Ceiling

229 mm -

235 mm

229 mm -

235 mm

57 mm Min

Cutout

Finished Ceiling

Tee

Tee

Nipple

Cutout

229 mm -
235 mm

Advertising