Cutting Vent Tubes

This is the most important part of the installation. With the furnace

installed on wall the 6" diameter air inlet tube and the 4" diam-

eter flue outlet tube are to be marked and cut using the following

procedure.
1. Attach 6" diameter air inlet tube onto the collar of air drop

assembly. Be sure 6" diameter air inlet tube is placed as far as

possible onto the collar of the air drop assembly. Mark the 6"

diameter air inlet tube 1/2" beyond the outside wall. Remove

6" diameter air inlet tube from collar of air drop assembly.

2. Attach 4" diameter flue outlet tube onto flue outlet collar on

combustion chamber. Be sure 4" diameter flue outlet tube is

placed as far as possible onto the collar of flue outlet. Mark

the 4" diameter flue outlet tube 2 1/4" beyond the outside wall.

Remove 4" diameter flue outlet tube from collar of flue outlet

on combustion chamber.

3. Mark or wrap tape completely around the tubes at the marked

points to help in making a true cut. Do not crimp or enlarge

tubes.

Installing Vent Assembly

1. Place provided caulking beneath the edge of the outside

mounting plate. Use additional caulking to correct uneven

wall surface, such as clapboard.

2. Attach 6" diameter air inlet tube onto the collar of air drop

assembly. Attach caulked, outside mounting plate into the 6"

diameter air inlet tube. Position the outside mounting plate so

that 6" diameter air inlet tube has a slight downward slope to

the outside. The downward slope is necessary to prevent the

entry of rainwater. Attach outside mounting plate to exterior

wall with (4) #10 x 1 1/2" screws provided.

3. Apply furnace cement to 4" diameter flue outlet collar on

combustion chamber and to 4" diameter collar on vent cap.

Attach 4" diameter flue outlet tube onto flue outlet collar on

combustion chamber. Attach vent cap into the 4" diameter flue

outlet tube. Attach vent cap to outside mounting plate with (3)

#10 x 1/2" screws provided.

4. Installation is completed.
Reassembly And Resealing Vent-Air Intake System

When vent-air intake system is removed for servicing the furnace,

the following steps will assure proper reassembly and resealing of

the vent-air intake assembly.
1. Remove old caulking beneath the edge of the outside mount-

ing plate. Apply new caulking beneath the edge of the outside

mounting plate. Use additional caulking to correct uneven wall

surface, such as clapboard.

2. Remove old furnace cement from flue outlet collar on com-

bustion chamber and collar of vent cap. Remove old furnace

cement from both ends of 4" diameter flue outlet tube.

3. Attach 6" diameter air inlet tube onto the collar of air drop

assembly. Attach caulked, outside mounting plate into the 6"

diameter air inlet tube. Position the outside mounting plate so

that 6" diameter air inlet tube has a slight downward slope to

the outside. The downward slope is necessary to prevent the

entry of rainwater. Attach outside mounting plate to exterior

wall with (4) #10 x 1" screws provided.

Figure 8

Locating Electric Supply

A 7/8" diameter knockout is provided at the bottom of the left

and right side panels. A three-prong (grounding) plug assembly is

located within the control compartment (bottom) of the furnace.

Please remove 7/8" knockout from appropriate side panel when

routing plug assembly to an electrical outlet.
Installation of Three-prong (Grounding) Plug Assembly

1. Disconnect nylon cap on 3' plug assembly from nylon plug on

wiring harness. Remove 3' plug assembly from control compart-

ment (bottom) of the furnace.

2. Remove 7/8" knockout from appropriate side panel.

3. Insert nylon cap on 3' plug assembly into the 7/8" hole in the

side panel.

4. Connect nylon cap on 3' plug assembly to nylon plug on the

wiring harness.

5. Place 7/8" strain relief bushing around the cord of the 3' plug

assembly. Insert 7/8" strain relief bushing into the 7/8" hole in

the side panel.

Attention! The 7/8" strain relief bushing is located within the same

envelope as the Installation Instructions and Owner's Manual.
Attaching Furnace to Wall

Refer to Figure 5 for the location of the 7 1/2" diameter wall open-

ing for the furnace. After the wall opening has been located and

cut, position flue outlet on furnace in center of wall opening. When

attaching furnace to the wall remove that portion of baseboard and

molding on the wall which is behind the furnace. Attach furnace

to wall, at the outer casing top, with (2) toggle bolts provided and

to floor, at the outer casing bottom, with (2) #10 x 1 1/2" screws

provided.
Attention! The screw holes on the outer casing bottom are off-set

above the floor approximately 3/8". Do not over-tighten screws

and distort the off-set on the outer casing bottom. Distortion of

the outer casing bottom will not allow the lower front panel to be

attached to the furnace.