Locating Gas Supply

The gas line can enter the unit either through the floor or outside

wall. The gas line opening should be made at this time. Location

of the opening will be determined by the position of floor joists

and the valve and union used for servicing.

Note: Never use plastic pipe. Check to confirm whether your local

codes allow copper tubing or galvanized.
Note: Since some municipalities have additional local codes, it is

always best to consult your local authority and installation code.
The use of the following gas connectors is recommended:

— ANS Z21.24 Appliance Connectors of Corrugated Metal Tubing

and Fittings

— ANS Z21.45 Assembled Flexible Appliance Connectors of

Other Than All-Metal Construction

The above connectors may be used if acceptable by the authority

having jurisdiction. The state of Massachusetts requires that a flexible

appliance connector cannot exceed three feet in length.

Figure 1

Consult the current National Fuel Gas Code, ANSI Z223.1 CAN/

CGA-B149 (.1 or .2) installation code.
Installing a New Main Gas Cock

Each appliance should have its own manual gas cock.

A manual main gas cock should be located in the vicinity of

the unit. Where none exists, or where its size or location is not

adequate, contact your local authorized installer for installation

or relocation.
Compounds used on threaded joints of gas piping shall be resistant

to the action of liquefied petroleum gases. The gas lines must be

checked for leaks by the installer. This should be done with a soap

solution watching for bubbles on all exposed connections, and if

unexposed, a pressure test should be made.
Never use an exposed flame to check for leaks. Appliance must

be disconnected from piping at inlet of control valve and pipe

capped or plugged for pressure test. Never pressure test with

appliance connected; control valve will sustain damage!
A gas valve and ground joint union should be installed in the gas

line upstream of the gas control to aid in servicing. It is required

by the National Fuel Gas Code that a drip line be installed near

the gas inlet. This should consist of a vertical length of pipe tee

connected into the gas line that is capped on the bottom in which

condensation and foreign particles may collect.

Figure 2

Method of Installing a Tee Fitting Sediment Trap

Pressure Testing of the Gas Supply System

1. To check the inlet pressure to the gas valve, a 1/8" (3mm) N.P.T.

plugged tapping, accessible for test gauge connection, must be

placed immediately upstream of the gas supply connection to

the appliance.

2. The appliance and its individual shutoff valve must be

disconnected from the gas supply piping system during any

pressure testing of that system at test pressures in excess of 1/2

psig (3.5 kPa).

3. The appliance must be isolated from the gas supply piping

system by closing its individual manual shutoff valve during

any pressure testing of the gas supply piping system at test

pressures equal to or less than 1/2 psig (3.5 kPa).

Attention! If one of the above procedures results in pressures in

excess of 1/2 psig (14" w.c.) (3.5 kPa) on the appliance gas valve,

it will result in a hazardous condition.

NPT NIPPLE

Recommended Gas Pipe Diameter

Pipe Length

Schedule 40 Pipe

Inside Diameter

Tubing, Type L

Outside Diameter

Nat.

L.P.

Nat.

L.P.

0-10 feet

0-3 meters

1/2”

12.7mm

3/8”

9.5mm

1/2”

12.7mm

3/8”

9.5mm

10-40 feet

4-12 meters

1/2”

12.7mm

1/2”

12.7mm

5/8”

15.9mm

1/2”

12.7mm

40-100 feet

13-30 meters

1/2”

12.7mm

1/2”

12.7mm

3/4”

19mm

1/2”

12.7mm

100-150 feet

31-46 meters

3/4”

19mm

1/2”

12.7mm

7/8”

22.2mm

3/4”

19mm

GAS SUPPLY