Maintenance and servicing – Lennox Hearth EPIC40 User Manual

Page 23

Advertising
background image

3

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

Maintenance and Servicing

Maintenance Checklist:

The following should only be performed by a qualified

service technician.

CAUTION: Label all wires prior to disconnection when

servicing controls. Wiring errors can cause improper

and dangerous operation. Verify proper operation after

servicing.

. Annual inspection should be made and the following

checks performed:

o

When unit is cool, open glass viewing door and inspect

burner for dirt, soot and lint accumulations and remove

if necessary. If excessive soot accumulation is present

on burner, have a qualified service technician adjust

burner for proper combustion.

o

Clean inside of glass viewing door with gas fireplace

glass cleaner. NEVER attempt to open door or clean

glass when unit is hot.

o

Check the hot air outlet vents for lint or other accumula-

tions. Never block or restrict vent openings or obstruct

flow of ventilation air.

o

Check that direct vent pipe, air intake and flue are open

and free of soot, blockage, or debris.

o

Check gaskets once a year. Gaskets must be tight. Replace

if necessary.

o

Inspect the pilot system for proper flame. NEVER ADJUST

THE PILOT until after the gas pressure has been checked

and supply lines have been completely bled (this may

take an hour or more when bleeding through the pilot).

All pilots are checked and burned at the factory prior to

shipment. The pilot adjustment screw is located to the

lower left of the flame height control knob.

.2

Adjust the pilot screw to properly size the flames. The

flames should completely surround the thermopile

and thermocouple and extend across the main burner

tube ports. Be careful not to back the screw out of its

threads.

o

Check that the area around the stove is kept clear and

is free of combustible materials, gasoline and other

flammable vapors and liquids.

o

Check the millivolt system as per the table on this

page.

P

roPer

P

ilot

F

lame

a

PPearance

Figure 34

Millivolt and System Checks

Check

Test

To

Test

Connect

Meter

Leads to

Terminals

Thermostat

Connects

Meter

Reading

Should Be

A

Complete

System

 & 3

Closed

00 MV

or More

B

Thermopile

Output

 & 

Open

Greater

Than

35 MV

C

System

Resistance

 & 3

Closed

.5 Ohms

See Figure 33 - Wiring Terminals

. The viewing glass should be cleaned periodically (see

Glass Door Cleaning and Maintenance).

3. Should repairs or maintenance of the stove require

the disassembly of the vent/air intake system, the

reassembly and resealing should be completed by a

qualified service technician and follow the instructions

on Page 13 of this manual.

Advertising
This manual is related to the following products: