Maintenance, Door opening – Lopi Horizontal Or Vertical Vent Freestanding Stove Yankee Pellet Stove User Manual

Page 27

Advertising
background image

Maintenance

2 7

Travis Industries

4050418

1 0 0 - 0 1 1 5 6

Door Opening

WARNING

: Make sure the heater has fully cooled (approximately 25 minutes) before opening the door.

When securing the door, make sure the
pawl fits over the bracket before tightening.

NOTE: Do not overtighten the pawl.
This can permanently damage the
latch and prematurely wear out the
door gasket.

Door Frame

Bracket (attached to side of

heater)

Pawl

Lock Nut

Phillips

Screwdriver

With the pawl free of the bracket,
the door may be swung open.

Advertising