Assembly instructions – Landice 72070 User Manual

Page 7

Advertising
background image

2

Assembly Instructions

• On L7 treadmills it is necessary

to remove the bolts which hold
the treadmill to the pallet.

• Start by removing the top bolts.
• Lay the treadmill on the ground,

and then remove the bottom
bolts by placing the treadmill on
your toolbox.

• With the bolts removed, the

treadmill will be free to move
around in the box.

• Remove the metal strapping

around the box.

• Using a razor blade knife, cut the

box just above the bottom row
of brass staples along all sides
of the box.

DO NOT cut through the

center of the box, as you could
damage the treadmill.

• Remove the box and discard.

• The treadmill components

are held together with plastic
strapping.

• Carefully cut and remove the

strapping. Remove the treadmill
upright and accessory boxes
from the treadmill. Lift the
treadmill off the pallet.

• Carefully remove the upright

side cover from the upright
assembly.

• Slide the upright down onto the

8-side frame bolts.

• Tighten bolts with a 7/16”

extended socket.

• The handrail mounting bolts

have been threaded into the rails
for shipping. Remove them.

• Attach both handrails by first

hand-starting the bolts through
the upright and then using a
1/2” socket. Leave about 1/8”
of slack.

(DO NOT TIGHTEN FLUSH TO
SURFACE).

• After mounting both handrails,

gently lower the curved crossbar
into position between them.

• Each end of the crossbar

should cover the two smaller
access holes that are cut into
the handrails.

• Leave contact heart rate

connection harness hanging
for now.

STEP 1:
Unbolt treadmill from pallet

STEP 2:
Cut the box off the pallet

STEP 3:
Unstrap the treadmill

STEP 4:
Secure upright to frame

STEP 5: Prepare to install hand
rails (Med Rails: the word
handrails
refers to the 4”
clamps for steps 5-8)

STEP 6:
Place crossbar

• Using an extended 1/2” socket,

carefully guide the 2 inch bolt
with lock washer into the big
access hole in the side of the
handrail.

• Once the bolt reaches the

crossbar, tighten it.

• Repeat this step with the other

handrail.

STEP 7:
Secure crossbar

• Press the dome plugs into the

large access holes on the side of
the handrails.

• Finish tightening the handrail

bolts from STEP 5.

Note: Med Rails go to Appendix

A on page 30.

STEP 8:
Secure hand rail

Advertising