D1.8 Seismic Supplement Welding Manual

www.lincolnelectric.com

Table 2 provides a list of references to specific D1.8 code provisions of particular interest to the
structural detailer:

Fabricators and Erectors
Much of D1.8 is directed to the Contractor performing the welding. The various provisions directed toward
the Contractor can be grouped into these major categories:





Welder Qualification





Welding Procedure Specifications (WPSs)





Filler Metals





Techniques

Welder Qualification
Clause 5 and Annex D of D1.8 are devoted to welder qualification. In addition to meeting the welder
qualification requirements of D1.1, welders performing work under D1.8 are required to take the
Supplemental Welder Qualification for Restricted Access Welding Test, as prescribed in Annex D, when
the production weld involves all of the following:

a) the weld is Demand Critical; and

TABLE 2: SPECIFIC D1.8 CODE PROVISIONS

Structural Detail

D1.8 Coverage

Access Holes

1.2.1(9), 6.9

Backing—Removal

1.2.1(5), 6.7, 6.8

Backing—Remaining in Place

1.2.1(6), 6.12

Contouring Fillet Welds

1.2.1(8), 6.8

Corner Clips

4.1

Demand Critical Welds

1.2.1(4), 3.2

End Dams

6.11

k-Area Detailing

3.6, 4.1

Protected Zone

1.2.1(3), 3.3, 6.6, 6.15

Reinforcing Fillet Welds

See Contouring Fillet Welds

Seismic Force Resisting System (SFRS)

1.2.1(2), 3.1

Tabs

1.2.1(7), 6.10

Tack Welds

6.6, 6.16

Tension Transition Butt Joints

1.2.1(11)