LG MV1825SW User Manual

Page 29

Advertising
background image

7-18

COMPONENTS

TEST PROCEDURES

RESULTS

RELAY2

Check for continuity of relay 2 with an
ohm-meter.
(Remove wire leads from relay 2 and
operate the unit.)

NOTES:

A MICROWAVE ENERGY TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS SERVICED FOR
ANY REASON.

MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.

WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE CONNECTOR, NOT
THE WIRES.

B. CHECKOUT PROCEDURES

(1) CHECKOUT PROCEDURES FOR FUSE BLOWING

CAUTION: REPLACE BLOWN FUSE WITH 20 AMPERE FUSE.

Fuse blows immediately after
the door is closed.

Fuse blows immediately after
the door is opened.

Fuse blows when the door is closed and START
key is touched.

Improper operation of the primary interlock, secondary
interlock switches and/or the interlock monitor switch.

Malfunction of the high voltage transformer; the high
voltage capacitor including the diode, the magnetron,
the blower motor or the circuit board.

PROBLEMS

CAUSES

POWER

LEVEL

1

2

3

4

5

6

7

8

9

10

4 sec

6 sec

8 sec

10 sec

12 sec

14 sec

16 sec

18 sec

20 sec

22 sec

18 sec

16 sec

14 sec

12 sec

10 sec

8 sec

6 sec

4 sec

2 sec

0

NOTES:

If the fuse is blown by an improper switch operation, replace the all Interlock switches, PCB Ass’y and the fuse at
the same time. After replacing the the all Interlock switches, PCB Ass’y,Fuse with new ones, make sure that they
are correctly connected.

Check for microwave energy leakage according to INTERLOCK ADJUSTMENT PROCEDURES on page 7-12
when the primary interlock, secondary interlock switches and/or the interlock monitor switches are adjusted or
replaced.

Relay 2

Figure 32

CAUTION : The relay connector 2 must

be correctly connected Relay 2.

Advertising
This manual is related to the following products: