Boiler set-up – PB Heat MI/MIH series User Manual

Page 8

Advertising
background image

6

BOILER SET-UP

1. Provide a sound, level foundation. Locate boiler as

near to the chimney or outside wall as possible and
centralized with respect to the heating system.

2. Locate boiler in front of installation position before

removing crate.

3. If using combustible floor pan, position pan on

foundation or flooring.

4. Separate the wood shipping pallet from the boiler

base by removing two (2) hold-down bolts at each
end of the boiler base.

5. Move boiler into final position. If using combustible

floor pan, install boiler on pan as outlined in the
instructions included with the pan.

2. BOILER SET-UP

Advertising