Patterson-Kelley TBIG-03 User Manual

Page 4

Advertising
background image

Gemini

â Twin-Fuel Gas-Fired Boiler

2.0 D

ESCRIPTION

2.1 P

RINCIPLE OF

O

PERATION


Natural gas and propane are permanently piped to
separate connections on the boiler. Each branch of the
gas train is fitted with a regulator and a motorized gas
valve. The regulators are adjusted to properly fire the
boiler from their respective sources. Boiler and con-
trol functions are the same for both fuels.

In the event of interruption or restriction of the natural
gas supply, changeover to propane is made manually

by a selector switch on the boiler (or by a signal from
a remote switch or controller).

When the natural gas supply is reestablished, change-
over is made by restoring the selector switch to its
normal position (or by sending the appropriate signal
from the remote controller).





3.0 S

AFETY

3.1 G

ENERAL


The Gemini™ gas-fired boiler must be:

· Installed by qualified personnel in accordance

with designs prepared by qualified facility engi-
neers including: structural, mechanical, electrical,
and other applicable disciplines.

· Operated and serviced in accordance with a com-

prehensive safety program determined and estab-
lished by the customer and complying with all
safety provisions of this manual. Do not attempt
to operate or service the boiler until such a pro-
gram has been established.

· Operated and serviced by qualified, properly

trained personnel in accordance with all applica-
ble laws and regulations.

3.2 T

RAINING

It is essential to read, understand, and follow the rec-
ommendations of this manual before installing, operat-
ing, or servicing this equipment. Failure to do so could
result in serious injury, death, and/or property damage.


Proper training is the best protection against accidents.
Operating and service personnel must be thoroughly
familiar with the basic construction of the Gemini™
boiler, the use and locations of the controls, the opera-


- 2 -

Advertising