Installation – Procom ML150TPA User Manual

Page 9

Advertising
background image

9

INSTALLATION

CONNECTING TO GAS SUPPLY

WARNING: A qualified
service person must connect
heater to gas supply. Follow all
local codes.

WARNING: This appliance
requires a 3/8

"

NPT (National

Pipe Thread) inlet connection
to the pressure regulator.

CAUTION: Never connect
h e a t e r d i r e c t l y t o t h e
propane/LP supply. This heater
requires an external regulator
(not supplied). Ins tall t he
external regulator between the
heater and propane/LP supply.

*A CSA/AGA design-certified equipment shutoff valve with 1/8

"

NPT tap is

an acceptable alternative to test gauge connection. Purchase the optional
CSA/ AGA de s ign-c e rt if ied equipm ent s h ut off v alv e f rom
your dealer. See Accessories, page 17.

IMPORTANT: Install an equipment
shutoff valve in an accessible
location. The equipment shutoff
valve is for turning on or shutting
off the gas to the appliance.

Install sediment trap in supply line
as shown in Figure 14. Locate
sediment trap where it is within
reac h for cleaning. Locate
sediment trap where trapped
matter is not likely to freeze. A
sediment trap traps moisture and
contaminants. This keeps them
from going into heater controls. If
sediment trap is not installed or is
installed wrong, heater may
not run properly.
IMPORTANT: Hold pressure
regulator w ith wrenc h w hen
connecting it to gas piping and/or
fittings.

CAUTION: Use pipe joint
sealant that is resistant to
liquid petroleum (LP) gas.

Figure 14 -Gas Connection

The installer must supply an
external regulator. The external
regulator will reduce incoming gas
pr es s u re . Yo u m us t r ed uc e
incoming gas pressure to between
11 and 14 inches of water. If you
do not reduce incoming gas
pressure, heater regulator damage
c ould oc c ur. Inst all external
regulator with the vent pointing
down as shown in Figure 13.
Pointing the vent down protects it
from freezing rain or sleet.

Figure 13 - External Regulator with
Vent Pointing Down

CAUTION: Use only new, black
iron or steel pipe. Internally-tinned
copper tubing may be used in
certain areas. Check your local
codes. Use pipe of large enough
diameter to allow proper gas volume
to heater. If pipe is too small,
undue loss of pressure will occur.

Installation must include an
equipment shutoff valve, union,
and plugged 1/8

"

NPT tap. Locate

NPT tap within reach for test gauge
hook up. NPT tap must be
upstream from heater(see Figure 14).

Apply pipe joint sealant lightly to
male threads. This will prevent
excess sealant from going into
pipe. Excess sealant in pipe could
result in clogged heater valves.

r

Typical Inlet Pipe Diameters
All models up to 20,000 BTU’s use
3/8’’ or greater pipe;
All models 25,000 BTU’s and higher,
use 1/2” or greater pipe.

WARING

:

Do not over tighten gas

connections.

Advertising
This manual is related to the following products: