6compact 2, Installation – Protec Protech Compact2 Film Processor SX 2 User Manual

Page 6

Advertising
background image

6

COMPACT 2

TM

Installation

®

Installation

1. Requirements for installation

a.

Fresh water connection: Stop cock with 3/4" outer-thread diameter (washing
machine connection), Water pressure 2 - 10 bar (29 - 145 psi).

b.

Drainage connection: Plastic tube - inner diameter 50 mm ”or larger. A ven-
tilated syphon which serves as odour preventor should be included in the
planning. The drainage tubes should be installed with a fall of minimum 5 %.
Local Water Authorities regulations should be complied with.

c.

Electrical connection: Fused wall socket with earth connection according to
electrical data (see technical specifications,

page 5

). It is also required to

install an earth-leakage switch (with 25 A / 30 mA nominal error current).

2. Installation of processor

a.

Unpack and assemble base table/ base cabinet respectively according
enclosed manual.

b.

Unpack Processor and mount onto base table/ base cabinet respectively
according to manual. Remove the transport securing bars of the roller-racks.
Fit the gear and dryer plates to the water/dryer-rack.

Electrical connections should be carried out according to reg-
ulations by an electrician.

1

6

3

2

5

8

7

4

Depending on model type the Compact 2 has either an open
stand or like shown here a closed cabinet.

1

Machine cover

2

Light protection cover on film infeed

3

Control panel

4

Power switch and main fuses

5

Replenishment tanks

6

Stop cock of water

7

Connections for freshwater, replenishment and
drainage respective overflow

8

Levelling feet

Advertising