Verifying dbm operation, Verifying network addresses – Paradyne COMSPHERE 3615 User Manual

Page 31

Advertising
background image

Installing the Model 3615 DualFlow DSU

2-11

3615-A2-GB20-20

December 1996

Verifying DBM Operation

A backup connection must be established to verify that

the switched network is functioning. Then, perform the
Digital Test by selecting the DBM path.

.

Procedure

1. Select Local (F1).

2. Select Bckup (F2).

3. Select Dial to establish a dialed call to the

tributary.

Refer to Chapter 4 for the procedure for entering
telephone numbers.

4. Press the

key, then select

!Cnnct to switch

to the dial circuit.

5. Press the

key twice.

6. Select Test (F3).

7. Select DBM (F2).

8. Select DT (F3).

9. Select Start (F1).

10. Select the amount of time you want the test to run

in hours: minutes: seconds (hh:mm:ss).

Press the

or

key to move the blinking

cursor to the digit to be changed.

Press the F1 (

") key to increment the digit

(1 through 9).

Press the F2 (

#) key to decrement the digit.

11. Select Enter (F3). Please wait appears as the

DBM runs the test.

12. When Command Complete appears, press the

key.

13. Select Displ (F1) to display the results of the test.

14. Press the

key to scroll through the test results.

Verifying Network Addresses

Access the DSU’s identity (ID) subbranch for the

tributary DSU to ensure that the DSU is properly
addressed. Refer to Chapter 5 for an example using the
DCP, if needed.

.

Procedure

1. Select Remot (Remote branch).

2. Enter the tributary’s network address.

3. Select Stat (Status branch).

4. Press the

key until ID appears.

5. Select ID.

6. Press the

key until Network Addr appears.

7. Verify that the correct address has been entered.

Advertising
This manual is related to the following products: