Ar r – Peerless Industries Peerless-Av Dukane Projector Short Throw Wall Arm UST-WallArm3 User Manual

Page 10

Advertising
background image

10 of 14

ISSUED:07-25-11 SHEET #: 125-9225-1

FRONT OF PROJECTOR

FRONT OF PROJECTOR

Installation using Wall Arm Bracket and Extension Bracket

FRONT OF PROJECTOR

9

10

DETAIL 2

B

C

Snap extension cap (

U) into extension bracket (B) in orientation as shown in figure 9.1.

Slide wall plate cover (

E) onto wall arm bracket (C).

Slide extension bracket (

B) into wall arm bracket (C) in desired position.

TIGHTEN

SCREWS

H

I

SECOND HOLE

MAY ALSO BE

USED IF DESIRED

I

KEYHOLE

NOTE: Verify that all screws

are in the center of the slot.

T

FIGURE 9.2

FIGURE 9.1

B

U

PROJECTOR POSITION FOR 70" - 100" SCREEN SIZE

E

DETAIL 3

DETAIL 4

R

Requirements for Shim Spacer
1. When the front pre-fastened M5 x 20 mm socket pin serrated washer head screw (R) of the adapter plate

assembly (

A) goes through the extension bracket (B) and wall arm bracket (C).

2. When there is a gap between the bottom of the projector attachment bracket (

H) and the extension bracket (B).

NOTE: If Shim spacer plate (I) is not required skip to step 11

Position exposed M5 x 20 mm socket pin serrated washer head screws (

R) through slot in extension bracket (B) and

wall arm bracket (

C).Position screws in keyholes in projector attachment bracket (H), and hole in shim spacer plate

(

I) as shown in detail 3. Slide projector attachment bracket (H) toward wall. Once in locked position tighten all three

M5 x 20 mm socket pin serrated washer head screws (

R) using security wrench (Q) as shown in detail 4.

Secure extension bracket (

B) into wall arm bracket (C) and secure using four M5 x 10 mm socket pin screws (T) in

desired position.

NOTE: Make sure that four M5 x 10 mm socket pin screws (T) are used.

SKIP TO STEP 12.

A

R

R

Advertising