Gb c, Bh a r r – Peerless Industries Peerless-Av Dukane Projector Short Throw Wall Arm UST-WallArm3 User Manual

Page 11

Advertising
background image

11 of 14

ISSUED:07-25-11 SHEET #: 125-9225-1

FRONT OF PROJECTOR

FRONT OF PROJECTOR

FIGURE 9.2

FIGURE 9.1

FRONT OF PROJECTOR

FRONT OF PROJECTOR

FRONT OF PROJECTOR

FRONT OF PROJECTOR

Installation using Wall Arm Bracket and Extension Bracket

PROJECTOR CABLES

11

12

Attach exposed M5 x 20 mm socket pin serrated washer head screws (

R) into top of adapter plate assembly (A)

through slot in extension bracket (

B) and keyholes in projector attachment bracket (H) as shown in detail 5.

Slide projector attachment bracket (H) toward wall. Once in locked position tighten all three M5 x 20 mm socket pin

serrated washer head screws (

R) using security wrench (Q) as shown in detail 6.

Secure extension bracket (

B) into wall arm bracket (C) and secure using four M5 x 10 mm socket pin screws (T)

using security wrench (

Q) in desired position. NOTE: Make sure that four M5 x 10 mm socket pin screws (T)

are used.

TIGHTEN

SCREWS

G

B

C

Route projector cables as shown. Use two cable management brackets (

G) as needed.

Fasten two M5 x 20 mm socket pin serrated washer head screws (

R) into top of adapter plate assembly (A).

R

NOTE: Verify that all screws

are in the center of the slot.

T

DETAIL 3

DETAIL 4

DETAIL 5

DETAIL 6

B

H

A

R

R

Advertising