Lifebreath 95MAX User Manual

Operation and installation manual, For models, Contains controlair 15

Advertising
background image

* LEAVE FOR HOMEOWNER

NOTE: Due to ongoing research and product development, specifications,

ratings and dimensions are subject to change without notice.

TI-84R-NE

1203

Installing Contractor

Telephone / Contact

Serial Number

Installation Date

Model

TO BE COMPLETED BY CONTRACTOR AFTER INSTALLATION

OPERATION AND

INSTALLATION MANUAL

Contains ControlAir 15

For Models:

95MAX
155MAX
200MAX
MAXTOP
195DCS
300DCS

200ERV
200ERVD

CAUTION
Before installation, careful consideration must be given to
how this system will operate if connected to any other piece
of mechanical equipment, i.e. a forced air furnace or air
handler, operating at a higher static. After installation, the
compatibility of the two pieces of equipment must be
confirmed by measuring the airflow’s of the Heat Recovery
Ventilator (HRV) Energy Recovery Ventilator (ERV) by
using the balancing procedure found in this manual.

It is always important to assess how the operation of any
HRV/ERV may interact with vented combustion equipment
(ie. Gas Furnaces, Oil Furnaces, Wood Stoves, etc.).

NEVER install a ventilator in a situation where its normal
operation, lack of operation or partial failure may result in
the backdrafting or improper functioning of vented combus-
tion equipment!!!

IMPORTANT - PLEASE READ THIS
MANUAL BEFORE INSTALLING UNIT

Advertising