Chapter 2 installation, Introduction, Site requirements and prerequisites – RAD Data comm MBE10-1D User Manual

Page 27: 1 introduction, 2 site requirements and prerequisites

Advertising
background image

Site

Requirements

and Prerequisites

2-1

Chapter 2
Installation

This chapter describes the basic installation procedures for the MBE unit,
including:
• Site requirements and prerequisites
• Package contents
• Equipment needed
• Installation and setup.

2.1 Introduction

MBE is delivered completely assembled. For instructions on installation of a single
unit or two units in a 19-inch rack refer to the Rack Mounting Kit for 19-inch Racks
guide that comes with the RM kit.
After installing the unit, see

Chapter 3, Operation

for operating instructions.

In case a problem is encountered, refer to

Chapter 4

for fault isolation and

troubleshooting instructions.

Any adjustments, maintenance or repairs should be performed only by a skilled

technician who is aware of the hazards involved.
Always observe standard safety precautions during installation, operation, and
maintenance of this product.

2.2 Site Requirements and Prerequisites

Inspect the equipment container before unpacking. Note and report evidence of
damage immediately to your RAD distributor.

Install the MBE unit within 1.5m (5 ft) of a grounded AC outlet furnishing
240V (115V).
Allow at least 90 cm (36") of frontal clearance for operator access. Allow at least
10 cm (4") clearance at the rear of the unit for interface cable connections.
The ambient temperature should be regulated between 0° to 50°C
(32°F to 122°F) at a relative humidity of up to 90%, non-condensing.

Note

Order from: Cutter Networks

Ph:727-398-5252/Fax:727-397-9610

www.bestdatasource.com

Advertising
This manual is related to the following products: