Installation, Masonry liner/ bricks, Louvers – Regency Wraps Z2510L User Manual

Page 19: Glass installation, Door handle, Latch adjustment, Secondary air tube installation, Operating instructions, First fire

Advertising
background image

Regency Z2510 WarmHearth

19

INSTALLATION

MASONRY LINER/

BRICKS

Insulated refractory panels are included to
extend the life of the fireplace and help radiate
heat more evenly. Make sure Insulating Paper
is in place along the bottom, side and rear
before bricks are put into place. Insulation batt,
1 in. thick is placed above the top brick baffle.

Using the diagram to find the correct location of
the panels install in the following sequence:
sides, rear, bottom, top. Care should be taken
not to damage the panels during installation.
THE LOG ANDIRONS SHOULD NOT BE RE-
MOVED.

LOUVERS

The unit comes with standard black louvers but
can have Gold Plated Louvers as an option.
There are 2 sets of louvers: the top consists
of 4 louvers and the bottom has 5 louvers.

To attach the louvers first slide 2 spring nuts into
place making sure the smaller holes are on the
back of the unit. Louvers are held in place by
feeding the two screws through the spring
nuts. Louvers can be removed by inserting a
screw driver between the louvers and remov-
ing the screws.

GLASS INSTALLATION

Remove the wire retainer from the door, and
place the glass in the door, making sure that the
glass gasketing will properly seal your unit. The
retainer should be resting on the gasketing not
on the glass. Tighten securely, but do not wrench
down on the glass as this may cause breakage.
Do not substitute materials. If your glass door
breaks, do not use your unit until it has been
replaced. See glass replacement section on
page 19.

DOOR HANDLE

The unit comes with a standard black door or
optional gold plated door. After the unit has
been installed and the facing completed place
the door onto the door hinges. Put hinge cover
caps on top of hinge to complete the door.
Install the gold spring handle onto the handle
bar.

LATCH ADJUSTMENT

The door latch may require adjustment as the
door gasket material compresses after a few
fires. Removal of the spacer washer shown
in the diagram below will allow the latch to be
moved closer to the door frame, causing a
tighter seal. Remove and replace the nuts,
washer and spacer as shown.

SECONDARY AIR TUBE

INSTALLATION

1) Slide air tube into the hole on the left hand side

of the firebox as far as it will go. The notch
in the air tube should be facing the right hand
side of the firebox.

2) Slide the air tube back towards the right side

until it locks into place. To lock into position,
use a pair of vise grips and tap them with a
mallet until the tube locks into place. The air
holes should be pointing down toward the
primary air opening just inside the bottom of
the door opening. The air tube will be difficult
to snap into place because it has to be a snug

fit in order to prevent it from falling out when
a fire is burning.

OPERATING

INSTRUCTIONS

Draft Control

Both the primary and air wash drafts are
controlled by the control rod located under your
ash lip. To increase your draft, push left for
open, to decrease push right for closed. The
draft control box is removable should it require
attention. From time to time a high temp lubricant
may be needed to keep the draft control sliding
easily. It must, however, be re-sealed with
RTV, high temperature silicone, when replaced.

FIRST FIRE

When your installation is completed and in-
spected you are ready for your first fire.

1) Open draft control fully. To the left is open,

to the right is closed.

2) Open firebox door and build a small fire

using paper and dry kindling. Secure door
on the firebox and wait a few minutes for
a good updraft in the flue to establish the
fire. Leaving the door slightly open will help
your fire start more rapidly and keep glass
clean. Add more kindling; then 2 x 2 or 2 x
4 softwood to establish a hot coal bed
before adding larger cordwood.

Advertising