20 step 6.4 turbulator installation – Roberts Gorden Linear Heater User Manual

Page 6

Advertising
background image

BH-S

ERIES

I

NSTALLATION

, O

PERATION

AND

S

ERVICE

M

ANUAL

20

Step 6.4 Turbulator Installation

Tw

ist

Pull String

Tab

Fold tab around outside

of tube nearest to the vent to

hold turbulator in place.

Turbulator

Section

Turbulator

Adapter

Description

Part Number

Turbulator Adapter 2.5' (76.2 cm)

03051503

Turbulator Section 2' (61 cm)

03051504

Turbulator Section 2.5' (76.2 cm)(Stainless)

03051505

Tube

91409XXX

Turbulator must be installed in the last
standard section of tube. Turbulator is
not required on the BH-125/150/175/200.

Turbulator Installation

Model

Tube Section

BH-40

1st 10' (3 m) Section

BH-60

2nd 10' (3 m) Section

BH-80

2nd 10' (3 m) Section

BH-100

3rd 10' (3 m) Section

BH-115

3rd 10' (3 m) Section

BH-125

N/A

BH-140

4th 10' (3 m) Section

BH-150

N/A

BH-175

N/A

BH-200

N/A

Turbulator section 2.5'
(76.2 cm) (stainless) used in
BH-40 heaters must be in the
section of turbulator nearest
to the burner.

Advertising