Reliance Water Heaters 317686-000 User Manual

Page 21

Advertising
background image

21

The condensate trap may be primed by filling the CONDENSATE

U-ASSEMBLY with tap water while the water heater is not operating.

The system is fully primed when the water level reaches the adaptor

connected into the Tee. In most installations the water heater will

self-prime the condensate trap during the first full heat-up cycle. If

a sound of air bubbling through water (gurgling) is heard while the

blower is operating after the first heat-up cycle, then turn the unit off

and contact your plumber or service representative.
If these instructions are not followed, the condensate build-up will

block the exhaust outlet, which will cause improper operation.

Do

NOT

block or

plug any

hole in this

hex plug.

DRAIN LINE

CONDENSATE

U-ASSEMBLY,

AKA. VENT PIPE

ASSEMBLY #1

APPROXIMATELY

0.25" (6.35 mm)

*NO PORTION OF THE FIELD SUPPLIED DRAIN LINE BEYOND

THE 1/2" ADAPTOR MAY BE ELEVATED HIGHER THAN THE

ADAPTOR. THIS MUST BE TRUE FOR THE ENTIRE LENGTH

OF DRAIN LINE INCLUDING EXIT INTO AN APPROPRIATE DRAIN.

fIGure 16.

Condensate is likely to form in the venting system attached to this

water heater. The vent pipe should be sloped downward away from

the blower assembly (not less than 1/8” (3.2 mm) nor greater than 1/2”

(12.7 mm) per foot (30 cm) maximum). If the vent piping is vented level

or sloped upwards away from the blower assembly, then adequate

means for draining and disposing of the condensate needs to be made

by the installer. Two 3/8” condensate hoses should be connected to

the built in drain ports of blower outlet adaptor. If a VAA is installed,

a 3/8” condensate hose should be connected to the barb fitting on it;

otherwise the unused barb fitting on vent pipe assembly #2 should be

plugged with one of the break-away plugs. See Figure 17.
Condensate neutralizer kits are available. Contact your distributor

or Service Agency.

Blower asseMBlY InstallatIon

1. This power vented water heater comes with blower assembly installed.
2. After unit is set in place, make sure blower assembly is still

mounted securely. Make sure there is no damage to blower.

3. Condensate drains from three locations on blower assembly.

See Figure 17. One flexible hose runs from bottom of blower

housing; two run from the ports of rubber connector at the outlet

of blower. All these three condensate hoses are connected to

barb fittings at vent pipe assembly #2. The hose from bottom

of blower housing is clamped by two clamps and the two hoses

from rubber connector are harnessed by another clamp. Make

sure there is no kink or twist.

fIGure 17.

4. Make sure there is no packing material in the inlet or discharge

of the blower.

5. Make sure that the plastic tubing is still attached from the air

pressure switch to the port on the blower housing. Make sure

the plastic tubing is not folded anywhere between the pressure

switch and the blower housing.

6. Make sure the ON/OFF switch is in the OFF position and that

the outer harness is connected from the blower control box to

the connector on the bottom side of the gas valve.

7. If the outer harness is not factory installed, make sure the ON/

OFF switch is in the OFF position and then connect the outer

harness from the blower control box to the connector on the

bottom side of the gas valve.

8. Do not plug in power cord until vent system is completely installed.

The Power Vent operates on 110-120 Vac. therefore a grounded

outlet must be within reach of the 6 foot (1.8 m) flexible power cord

supplied with the vent (See Figure 1). The power cord supplied

may be used on a unit only where local codes permit. If local

codes do not permit use of flexible power supply cord:

A. Make sure the unit is unplugged from the wall outlet. Remove

the plastic top cap. Remove screws and open panel on the

front of the control box on the blower.

B. Cut the flexible power cord, leaving enough to be able to make

connections. Remove the strain relief fitting from the box.

C. Install a suitable conduit fitting inside the enclosure.

D. Splice field wiring into existing wiring using code authorized

method (wire nuts, etc).

E. Be certain that neutral and line connections are not reversed

when making these connections.

F. Ground heater properly. This water heater must be grounded

in accordance with the National Electrical Code NFPA 70

and/or local codes. These must be followed in all cases.

The water heater must be connected to a grounded metal,

permanent wiring system; or an equipment grounding

conductor must be run with the circuit conductors and

connected to the equipment grounding terminal or lead on

the water heater, see Figure 19.

G. Close the panel on the control box. Make sure that the access

panel is secured shut.

9. The blower discharge boot is made to accept only straight sections of

2” pipe. To start off with an elbow, a short section of the furnished

pipe, a minimum of 2 inches (5.1 cm), must be cut and glued into

the end of the elbow that will mount on the discharge boot.

InstallatIon of vent sYsteM

Before beginning installation of piping system thoroughly read the

section of this manual VENT PIPE PREPARATION.

If you are installing your system so that it vents through roof, please

refer to section titled INSTALLATION OF VERTICAL VENT

SYSTEM.

vent terMInal InstallatIon, sIdewall

1. Install the vent terminal by using the cover plate as a template to

mark the hole for the vent pipe to pass through the wall. BEWARE

OF CONCEALED WIRING AND PIPING INSIDE THE WALL.

2. If the Vent Terminal is being installed on outside of a finished wall, it

Advertising
This manual is related to the following products: